(Completed) MAPA cellulose production plant

Participation: Adjustments in R-160 which involved earthworks, civil works and assembly, modification of structures, signs, lights to allow the passage of oversized equipment. In addition, management of permits, coordination with highway, carrier and road logistics required for transportation from port to plant.

(Finished) El Arrebol 9 MW wind farm

Participation: Various adaptations in R-160, modification of structures, lighting and road logistics for the transfer of oversized cargo.

(Finished) Puelche Sur Wind Farm 153 MW

Participation: Adjustments in R-5, V-25 and U-551, such as modification of structures such as tolls, removal and restitution of double wave barriers, displacement of informative signs and luminaries, lowering of signs and improvements. In addition to permit management.

(Finished) Campo Lindo Wind Farm 145.2 MW

Participation: Adjustments that involved temporary access on R-5 and widening of curves in the roadway, in addition to permit management.

(Completed) Rihue Wind Farm 138.6 MW

Participation: Route study.

(In development) Caman Wind Farm 306,6 MW

Participation: Adjustments in R-608 such as height pruning, slope cuts, art works, land improvements and civil works inside the park.

(Under development) La Cabaña Wind Farm 105.6 MW

Participation: Route study, management of road permits for the development of adaptations, road adaptations for the transfer of oversized load and restitution of the route to its original condition.

(Under development) Renaico II Wind Farm 144 MW

Participation: Route study, management of road permits for the development of adaptations, road adaptations for transfer of oversized load and restitution of the route to original condition.

Participation: Execution of route studies, bridge studies and audiovisual route survey representation.

Participación: Ejecución de estudios de ruta, estudios de puentes y representación audiovisual route survey.